Christmas is usually a slow time for shipping. However, I have been working away at getting things ready as soon as possible. I have put together the ATM90E26 Breakouts and Featherwings; these will ship to Crowd Supply next week. There was a slight delay in these due to ESD bags being held up over Christmas break.
I have also mobilized the local hackerspace in Adelaide for DIN Rail energy monitor assembly. It was a huge success, all energy monitor PCB’s have been assembled and are now being tested. I am aiming to ship these out late-January.
Thank you for your patience and support.
Regards,
Tisham